linaro-networking 2013.10

Milestone information

Project:
linaro-networking
Series:
trunk
Version:
2013.10
Expected:
2013-10-31  
Active:
Yes. Drivers can target bugs and blueprints to this milestone.  

Activities

Assigned to you:
No blueprints or bugs assigned to you.
Assignees:
2 Ciprian Barbu, 1 Maxim Uvarov, 1 Mike Holmes
Blueprints:
No blueprints are targeted to this milestone.
Bugs:
1 Won't Fix, 4 Fix Released

0 blueprints and 5 bugs targeted

Bug report Importance Assignee Status
1221479 #1221479 Transparent huge page is not enabled with preempt RT 3 High Ciprian Barbu  4 Won't Fix
1231760 #1231760 linaro-image-lng 4.8 build fails 3 High   10 Fix Released
1223034 #1223034 LTP test suite has failures with the "syscalls" tests 4 Medium Maxim Uvarov  10 Fix Released
1229218 #1229218 Hackbench reports enormous results 4 Medium Ciprian Barbu  10 Fix Released
1231673 #1231673 LTP-Realtime LAVA results parser does not remove the path 5 Low Mike Holmes  10 Fix Released
This milestone contains Public information
Everyone can see this information.